Customer case
Superior weldability and produced-to-length deliveries from mill – When highest quality and production efficiency are required
March 08, 2021 6 min read
![](/-/media/images/hollow-sectons/customer-cases/besthall-duodot/1920x570-duotot-top-image.jpg?m=20210308112006)
Case details
SSAB delivers structural hollow sections to the frame structures of Best-Hall’s buildings. One of the recent projects was Duodot. SSAB delivered over 100 tons of structural hollow sections to the Duodot project for steel frame warehouse building in southwestern Finland. Best-Hall built a logistic warehouse building for its customer for storing tires. The building is a combination of two halls, one part is 87 meters long, 44 meters wide, and the height is 9 meters from the lowest point. The other part is 132 meters long, 33 meters wide and 9 meters high.
![](/-/media/images/hollow-sectons/customer-cases/besthall-duodot/720x405-duodot-i01.jpg?m=20210308111454)